Select Page

The New Philadelphia Airport Commission is creating more space for pilots to keep their planes at Harry Clever Field. 

Commission chair Don Kennedy says the plan is to construct a 12-bay hangar off Delaware Drive south of the last one from 2019, with the new one hopefully finished in 2026. 

He says they currently have a waiting list of about 18 pilots wanting bays at the airport.

Kennedy says the estimated cost for the project is 1.2 million dollars.  Part of that would be covered by a 500-thousand dollar loan from the state infrastructure bank, which would be paid for by rental fees.

Kennedy says the airport is also getting 740-thousand dollars for the project from the federal bipartisan infrastructure bill.     

Copyright WTUZ Radio Inc., 2024